Adıyaman GES is the first PV Plant connected to the MV stage in Turkey. Adiyaman GES has a total capacity of 1000 kWp with an estimated annual energy production of roughy 1.535.000 kWh, avoiding the emission of over 998 tons of CO2 per year and saving 2.269 trees per year. Project was completed on May 2014.
Location | Adıyaman |
Assembly Type | Zemin |
Field (m2) | |
Situated Power | 1000 |
Yearly Expected Production Amount ( kWh) | 1535000 |
Blocked CO2 Amount ( tonne) | 938 |
Recovered Tree Amount(unit) | 2269 |
PV Module Brand and Power | Yingli Solar YL 255 P - 29b |
PV Module Amount | 4000 |
Inverter Brand | Danfoss TLX +15k |
Inverter Amount | 29 |
Construction Duration | 5 ay |
Activation Date | May. 14 |