Gaziantep GES has a total capacity of 1000 kWp with an estimated annual energy production of roughy 1.641.300 kWh, avoiding the emission of over 998 tons of CO2 per year and saving 2.416 trees per year. Project was completed on November 2014.
Location | GAZİANTEP |
Assembly Type | Zemin |
Field (m2) | 38000 |
Situated Power | 1000 |
Yearly Expected Production Amount ( kWh) | 1641300 |
Blocked CO2 Amount ( tonne) | 998 |
Recovered Tree Amount(unit) | 2416 |
PV Module Brand and Power | Yingli Solar YL 250 P - 29b |
PV Module Amount | 3864 |
Inverter Brand | Danfoss FLX Pro 15k |
Inverter Amount | 58 |
Construction Duration | 3 ay |
Activation Date | Kas.14 |