Guler Soguk Hava GES – self consumption model rooftop Project - is located in Kahramanmaras. Plant has a total capacity of 500 kWp with an estimated annual energy production of roughy 193.225 kWh, avoiding the emission of over 118 tons of CO2 per year and saving 285 trees per year. Project was completed on March 2014.
Location | ISPARTA |
Assembly Type | Çatı |
Field (m2) | |
Situated Power | 144 |
Yearly Expected Production Amount ( kWh) | 193225 |
Blocked CO2 Amount ( tonne) | 118 |
Recovered Tree Amount(unit) | 285 |
PV Module Brand and Power | Yingli Solar YL 250 P - 29b |
PV Module Amount | 576 |
Inverter Brand | Danfoss FLX Pro 15k |
Inverter Amount | 9 |
Construction Duration | 2 hafta |
Activation Date | Mar.14 |