Kayseri BCKK GES located in Kayseri has a total capacity of 6.317 kWp with an estimated annual energy production of roughy 10.075.615 kWh, avoiding the emission of over 6.103 tons of CO2 per year and saving 14.800 trees per year. Plant will be installed on the area of 115000m2.
The construction of the solar farm was started at the beginning of 2016. The grid connection is expected on 2016.
The construction of the solar farm was started at the beginning of 2016. The grid connection is expected on 2016.
Location | Kayseri |
Assembly Type | Zemin |
Field (m2) | 115000 |
Situated Power | 6317 |
Yearly Expected Production Amount ( kWh) | 10.075.615 |
Blocked CO2 Amount ( tonne) | 6103 |
Recovered Tree Amount(unit) | 14800 |
PV Module Brand and Power | Trina Solar PD05-60 All Max |
PV Module Amount | 24288 |
Inverter Brand | ABB Trio 27,6 kW |
Inverter Amount | 184 |
Construction Duration | 7 ay |
Activation Date | 2016 |