Konya Kizoren GES located in Kizoren region of Konya has a total capacity of 22,5 MWp with an estimated annual energy production of roughy 30.730.000 kWh, avoiding the emission of over 18.702 tons of CO2 per year and saving 45.505 trees per year. The first phase of the Project – it is a total installed capasity of 18.500 kWp - has just commissioned at the end of December 2015. The most important feature of the Project is the biggest Solar Power Plant in Turkey.
Location | KONYA |
Assembly Type | Zemin |
Field (m2) | 430000 |
Situated Power | 18500 |
Yearly Expected Production Amount ( kWh) | 30730000 |
Blocked CO2 Amount ( tonne) | 18,702,00 |
Recovered Tree Amount(unit) | 45505 |
PV Module Brand and Power | Yingli Solar YL 250 P - 29b |
PV Module Amount | 74106 |
Inverter Brand | SMA Sunny Central 900 |
Inverter Amount | 18 |
Construction Duration | 8 ay |
Activation Date | Ara. 15 |